Sewage treatment plant Mühlhausen - study sludge drying
|
Subject
|
|
Two heat provision options for the on site installed sludge drying based on renewable energies were analysed. The options were a heat provision from a wood chip heating plant or a solar heating system.
|
 |
|
Time Frame
|
|
|
 |
|
Work Performed
|
|
Besides planning the wood chip heating plant and the solar heating system a cost estimation was realized.
|
 |
|
Details
|
|
|
 |
|
Client
|
|
Pöyry GKW Erfurt
|
 |