Picture: Logo IGW

Contact  ·  About

Start search






Reference

« Back    Printversion of this pagePrint

Thermal residual waste treatment and energy recovery facility (TREA) Breisgau (Germany)

Subject
Specification for the residual waste management (plant delivery and operation), starting from 2005
Time Frame
 
1998 - 2000
Work Performed
 
Preparation of the procurement documentation

Collaboration in the procurement

Review and comparison of bids for both thermal and non-thermal (MBT-) treatment concepts

Review of the total capital and operation costs expenditures for a contract period of 20 years
Details
 
The contract includes both the delivery and operation of the waste treatment facility.
The bids could include all possible types of treatment processes, both thermal and MBT.
The facility has to be installed and operated on a predetermined site.

The facility must operate economically with an input between 80,000 and 150,000 t/yr throughput

Facility commissioning date: 2004
Client
 
Gesellschaft für Abfallwirtschaft Breisgau (GAB)

TREA Breisgau: operator Sotec GmbH, start of operation in 2004, annual throughput 150,000 t (Bild: Michael Spiegelhalter)

 

Home  ·  Contact  ·  About
Top

© 2010 by IGW Ingenieurgemeinschaft Witzenhausen Fricke & Turk GmbH · Bischhäuser Aue 12 · D-37213 Witzenhausen · Germany · Phone: +49 5542/9308-0 · Fax: +49 5542/9308-20. All rights reserved.